In the high-stakes environment of UK rail, "safety" is often managed through a chaotic mix of emails, PDFs, and site-level assumptions. This creates a dangerous gap—where the wrong versions are issued, verbal approvals leave no audit trail, and management has zero live visibility of authorid work.
DocuRail was built to close that gap.
We replaced "passive documentation" with
Enforced Digital Control.
Our mission is simple: to ensure that live rail work only proceeds
when it is 100% authorised, 100% visible, and 100% compliant.
The UK’s Leading ALO & POS Control SuiteDocuRail is the industry’s primary choice for controlling the most critical elements of rail maintenance and construction.
Our platform is the "digital gatekeeper" for:
Any Line Open (ALO) Control: Mandatory digital sign-offs and live status updates ensure that equipment never fouls open running lines without verifiable authorisation.
Plant Operating Scheme (POS) Control: Absolute control over plant, operators, and lift approvals. If the authorisation isn’t complete and visible, the work doesn't start.
Integrated Safety Modules: From Digital Permits and Task Brief Sheets to compliant Safe Work Packs, we provide a single, live, authoried version of the truth to both site teams and management.
Built on 50 Years of Front-Line Expertise
DocuRail is not just a software company; we are a strategic partner in rail safety.
Through our exclusive partnership with
International Rail Training and Consultancy (IRTC), our systems are guided by
Andy Crago.
As a Chartered Engineer and the Management Committee Chair for the
Rail Plant Association (RPA).
With nearly five decades of experience in the UK rail sector, Andy and the IRTC team ensure that DocuRail is finely tuned to the complexities of Network Rail,
London Underground, and high-speed infrastructure demands.
Unrivaled Impact. Proven Results.
We measure our success by the absolute control we return to your operations. Across live POS and ALO approvals in active rail environments, DocuRail has delivered:
68% Reduction in approval turnaround time.
92% Decrease in missing or incomplete approvals.
100% Audit Readiness with defensible,
time-stamped evidence for every decision made on-site.
Paper and PDFs do not control work.
Systems that enforce approval do.
Welcome to the future of rail worksite management.